|
Review 7/13/2010
|
New Bathtub/Shower with tile, July 8-9, 2010.
Mitch Maertens Construction came to do demo/install of my master bathroom tub/shower. They redid the plumbing with clean copper lines. They installed brand new drywall with moisture control after installing a bathtub. George custom tiled the wall from the top of the tub to the ceiling, fabricating custom shelves made out of marble. Everything was done in a thorough manner, papering the carpet and laying drop cloths through the house to keep from getting it dirty. They vacuumed and cleaned after themselves. I highly recommend them both for the job they did and their professional manner.
|
|
|
|
|
|
|